Beyond The Valley
Beyond The Valley
Beyond The Valley

PROJECT DETAILS
Client: Untitled Group Location: Barunah Plains, Victoria Tetrik, in collaboration with InTension Group, was contracted to design and construct five new structures for the BTV event site. These design projects were developed in consultation with key stakeholders at the event site. Providing over 10,000 square meters of covered space across the event site, our contributions ranged from the highly intricate Dance Dome structure to a functional and aesthetically pleasing main stage shade, as well as large shade structure for the food court, Podcast stage and Arena Entry. In addition to the design, production, and permitting of these structures, InTension Group executed multiple complex rigging projects on the site, including suspended speaker systems and tension wire installations for production purposes. All on-site operations were managed by our team, ensuring the delivery of fully certified and engineered projects throughout the event site. A primary consideration was the five-week installation period, which necessitated addressing the high wind conditions prevalent at the location.
Client: Untitled Group Location: Barunah Plains, Victoria Tetrik, in collaboration with InTension Group, was contracted to design and construct five new structures for the BTV event site. These design projects were developed in consultation with key stakeholders at the event site. Providing over 10,000 square meters of covered space across the event site, our contributions ranged from the highly intricate Dance Dome structure to a functional and aesthetically pleasing main stage shade, as well as large shade structure for the food court, Podcast stage and Arena Entry. In addition to the design, production, and permitting of these structures, InTension Group executed multiple complex rigging projects on the site, including suspended speaker systems and tension wire installations for production purposes. All on-site operations were managed by our team, ensuring the delivery of fully certified and engineered projects throughout the event site. A primary consideration was the five-week installation period, which necessitated addressing the high wind conditions prevalent at the location.
Service
Festival events
Year
2025





Next Project

